Power Infrastructure

Power Line Inspection

Power line and grid component inspection with 112× hybrid zoom and a 640×512 thermal sensor — component-level anomaly detection without scaffolding. Offered as a pilot project: every flight needs the grid operator's written consent, which we obtain together with you before a date is set.

How we operate

  1. 01
    Operator consent & corridor clearance

    Flights over and near power infrastructure require the written consent of the grid operator (§ 21h LuftVO). We prepare that request with you and file the DIPUL/DFS corridor clearance before any date is agreed — no ad-hoc flight.

  2. 02
    112× zoom systematic visual pass

    The M4T flies the corridor at the standoff distance agreed with the operator. The 112× hybrid zoom resolves component-level detail — wire insulation cracks, connector corrosion, pole base condition.

  3. 03
    Simultaneous thermal anomaly scan

    The 640×512 thermal sensor identifies overheating joints, failing insulators, and leakage currents in the same pass as the visual — one flight, two sensor streams.

  4. 04
    Prioritised inspection report

    Anomalies catalogued by GPS position and severity rating (critical / monitor / pass). Each finding supported by thermal + visual imagery. Report ready for maintenance planning.

Request a Mission Brief

Describe your site and objectives. We'll respond within 24 hours with a tailored proposal.

DrohnXit Drone Services & AI Solutions
Service Area Stolzenau, DE · Germany-Wide
Response within 24 hours